Paradise 8” Steel High Pressure Replacement with 6” PE in Joint Trench, Las Vegas, Nevada

This gasline project installed 4,400 l.f. of 8" steel high pressure (120#) main and 3,500 L.F. of 6" PE high pressure (33#) main in joint trench & abandoned 2,800 L.F. of 6" steel high pressure main and 4 regulating stations in Paradise Road from Harmon Avenue to Sands Avenue in Las Vegas, Nevada. Project also includes installation of new bridle assembly, valves and cathodic protection facilities.

Project scope includes boundary & topographic survey, utility research, gas facility design and provide construction management and as built services.